/>
In April 2026 the General Office of the CPC Central Committee and the General Office of the State Council issued guidance on doing energy saving and carbon reduction work to a higher standard. The section on building energy efficiency sets out stricter energy performance management for new buildings, better energy-saving design, large-scale development of ultra-low-energy buildings, and good housing that is safe, comfortable, green and smart.
Two changes reach the grille trade directly. On new-build projects, requirements on grille leakage and on the fit between frame and face panel are tighter, and recessed installation is being preferred over surface mounting. As retrofit work grows, enquiries for surface-mounted linear grilles, thicker frames and removable cores have increased noticeably.
When quoting we confirm first whether the job is new-build or retrofit and what ceiling board is used, then decide between recessed and surface-mounted, so the frame does not turn out not to fit the ceiling edge on site.